Let’s start by discussing what landed property is,
A residential structure constructed on land owned by a landed property owner. The property is immovable because it is directly attached to the land.
That land has a permanent structure and landed houses are reasonably priced. 70% of the building’s surface is covered with land. The house is enormous.
Landed properties are something we’re all familiar with. There is a large building in residence; if the land area is 2000 square feet, the residence area should be at least 1400-1800 square feet.
The interiors and exteriors of a building need to be painted for various reasons.
We’ll take a quick look at How Long it takes to paint a landed property in Singapore.
Landed House Painting Time: Factors to Consider
So, why does the average time for painting a landed house play such a vital role?
Painting a home is dependent on weather, workmanship, size, and time. These are all factors to be analyzed when painting, which will dictate the time for the painting job.
Now let’s take a closer look at the elements.
Refer: How Often Do You Paint Your House’s Exterior and Interior?
Weather in Singapore:
Why is the weather so vital in the painting process?
The climate will have a significant impact on the drying process. The hot and humid climate will change abruptly, as it did in Singapore.
A humid climate delays drying time compared with a hot temperature.
The sudden rise in temperature in hot weather will not result in a smooth paint finish. If you paint during the rainy season, the drying time increases by two hours.
If the drying time is ordinarily two hours, it may increase by two hours during the rainy season. As a result, the weather will affect the painting time.
How Many Workers Are Needed for the Painting Job?
It depends on the house size; if it is large, more workers are needed; if it is small, fewer workers are needed.
As a result, we cannot predict how many workers will be required. Generally, the more workers there are, the larger the team; if only the interior of the home needs painting, the smaller the team.
Because landowners, house size, and scheduling time all play a part in determining how many workers are needed, we cannot predict how many will be required.
Read: Top 9 Most Important House-Painting Rules
Size of the Landed Property:
A landed house takes up 70% of the land area.
The structure will be massive if the land is 3000 square feet and the building area is at least 2100 square feet. As a result, the landed house has at least 5 to 6 rooms of varying sizes.
Whereas the building area is determined by the number of painters hired and the number of days required to complete the painting work, the size of the house is critical.
Scheduling for a Painting Project:
As for the schedule, it will depend on the availability of both the building owner and the painter.
If you’re hiring a painter, schedule a time that fits your schedule to paint your house. It is crucial to schedule the painting project to keep it on track.
Conclusion:
Considering the aforementioned factors, painting a landed house may take 3-12 days, depending on the painters, weather, number of rooms, and so on.
If the painting job is not completed by the deadline due to climate change, there will be fewer workers.
So, if you’re going to paint a landed house, make sure you clear all of your doubts before you begin; this will allow you to complete the painting work more quickly.
If you want to paint a landed house in Singapore, Meptech Painting Service can do it in a timely and cost-effective manner.
Also Read: The 7 Easy Steps to Interior Painting for Beginners